Primary & Secondary through school for Southampton City Council with a separate indoor sports hall facility and floodlit external MUGA pitches. The project was split into 2 phases with the primary school taking occupation 6 months prior to the main completion whilst the secondary & sports hall were under construction. The key features of the project included the incorporation of both photovoltaic (PV) panels and battery storage, the comprehensive IT package encompassed all active equipment, an audio-visual (AV) package was integrated into the main hall and drama studio, a hybrid natural ventilation system, the heating system was powered by gas fired boilers, catering to a combination of low surface temperature radiators and underfloor heating. The lighting system both wireless and equipped with emergency lighting control for safety and convenience. Domestic hot and cold water services to cater to daily needs and a full building management system package was integrated. Photographs by John Kees Photography.