CAMHS PICU

CAMHS PICU

J&B Hopkins delivered the specialist mechanical and electrical services installation for the new Child and Adolescent Mental Health Services (CAMHS) Psychiatric Intensive Care Unit (PICU) at Pebble Lodge in Bournemouth. Developed to enhance emergency mental health provision across Dorset, the purpose-built facility enables young people experiencing mental health crises to receive specialist inpatient care closer to home, reducing the need for out-of-area placements and helping them remain connected to their families and support networks. The development comprises an eight-bed inpatient unit, including a fully accessible bedroom, together with additional care facilities, classrooms, a tribunal room, communal courtyard and dedicated family visitor accommodation. J&B Hopkins delivered a comprehensive package of mechanical, electrical and specialist building services, including above-ground drainage and sanitaryware systems, domestic water services, heating and cooling systems, ventilation and thermal insulation, Building Management System (BMS) controls, low-voltage electrical infrastructure, power and lighting installations, containment systems, data and communications networks, fire alarms, nurse call systems, access control, CCTV, photovoltaic (PV) panels, lightning protection and electric vehicle charging points. Working alongside existing CAMHS services, the new facility provides a safe, modern and highly functional healthcare environment designed to support the recovery, wellbeing and long-term care of young people requiring intensive mental health treatment.
University of Sussex Health & Wellbeing Centre

University of Sussex Health & Wellbeing Centre

The University of Sussex Health & Wellbeing Centre was developed to create a single, integrated hub for healthcare and wellbeing services, bringing together NHS primary care provision and University support services within one modern facility.

 

Located within Newick House on the University’s Falmer campus, the centre has been designed to provide a welcoming, accessible, and user-focused environment for students, staff, and the wider community. The facility supports a collaborative approach to physical and mental wellbeing by enabling healthcare professionals, counsellors, and wellbeing teams to work more closely together.

The building accommodates a range of spaces across multiple floors, including reception and waiting areas, GP consultation rooms, counselling and therapy suites, treatment rooms, office accommodation, and flexible spaces for workshops, clinics, and group sessions. Accessibility has been a key consideration throughout the design, ensuring all areas can be easily accessed and used by visitors.

The completed development provides a high-quality healthcare and wellbeing environment that enhances the delivery of support services, improves the user experience, and creates a central destination for integrated care and wellbeing provision across the University campus.

Hopkins key project features included: Above Ground Drainage, Cold Water Services Distribution, MSFD’s Controls with the C&E’s, Part M Compliance DDA WC’s, Hot Water Heaters, Air Conditioning Systems, Solenoid and Valves, Water Metering, LV Distribution, Containment, Small Power & Lighting Distribution, Mechanical Supplies, Full Lighting Control Dali system, Emergency Lighting, General Lighting, Nurse Call, Fire Alarm, DDA Alarms, Extra Low Voltage Data Infrastructure, Intruder Alarms, CCTV, Access Control and the Full Air Handling Unit Ventilation (including heat recovery).

Portsmouth International Port

Portsmouth International Port

Hopkins Energy successfully delivered the full electrical installation works for ABB Automation’s new ship‑to‑shore charging system at Portsmouth International Port — a landmark project supporting the UK’s transition toward cleaner, low‑carbon maritime operations.

This innovative infrastructure enables vessels to connect directly to the local electricity grid while docked, eliminating the need for onboard diesel generators. By providing reliable shore power (also known as cold ironing), the port can significantly cut emissions, improve local air quality, and support wider Net Zero ambitions.

Delivered as part of the Sea Change initiative, the project showcases a strong multi‑partner collaboration between Portsmouth International Port, ABB Automation, Balfour Beatty plc, ShoreLink, and Hopkins Ltd. Together, the team has helped establish one of the UK’s leading examples of sustainable port technology.

Our Energy & Special Projects division played a key role in bringing the system online, undertaking:

  • Electrical containment installation
  • High‑voltage cabling and control cabling
  • All equipment and e‑house terminations
  • Integration support for ABB’s full shore connection solution, including drives, transformers, switchgear, and associated infrastructure

This completed installation now allows ferries and cruise vessels to plug into clean, grid‑supplied power while berthed — a major step forward in reducing emissions and supporting greener port operations.

Hopkins Energy is proud to have contributed to this transformative project, reinforcing our commitment to renewable energy, decarbonisation, and supporting customers across the UK in achieving Net Zero goals.

Glengall Road Student Accommodation, London

Glengall Road Student Accommodation, London

Glengall Road, known as Robeson House is a 676-bed hall of residence developed in collaboration with EQUANS and The London School of Economics and Political Science (LSE). Located just off Old Kent Road in London and adjacent to the 56-hectare Burgess Park, the building rises to 15 storeys in a stepped configuration. Purpose-built to serve LSE graduate students, it offers a vibrant and inspiring living environment within easy reach of the university’s Aldwych campus.

Hopkins Major Projects was appointed to deliver the full mechanical and electrical installation, encompassing:
• Low Temperature Hot Water (LTHW) heating systems
• Domestic water services
• Ventilation infrastructure
• Power distribution and lighting
• Integrated SMART building technologies

Robeson House exemplifies modern student accommodation—efficient, thoughtfully designed, and tailored to the academic lifestyle.

Cosham Fire Station

Cosham Fire Station

Cosham Fire Station is a new, purpose-built facility for Hampshire and Isle of Wight Fire and Rescue Service (HIWFRS), located on Northern Road in Cosham, Portsmouth, Hampshire.

This project forms part of a broader station investment programme by HIWFRS, which also includes the recently completed Bishop’s Waltham Fire Station (delivered by Hopkins in January 2023) and a state-of-the-art live fire training facility at the service’s headquarters in Eastleigh. These developments are vital to meeting modern operational requirements, supporting larger emergency vehicles, and enhancing training capabilities.

The Cosham station includes three appliance bays, dedicated training areas, fitness facilities, office and administration spaces, accommodation, catering provisions and a training tower.

Key MEP installations by Hopkins included:

  • Access control systems

  • Air Source Heat Pump (ASHP) Low Temperature Hot Water (LTHW) system

  • Photovoltaic (PV) system

  • Mechanical Ventilation with Heat Recovery (MVHR) system

  • Electric vehicle (EV) chargers

  • Building Management System (BMS)

  • CCTV

  • Q-Ton hot water system

  • Backup generator

  • Air conditioning (AC) system

  • Smoke delivery system

  • HAPSS sprinkler system

Butlins Playxperience, Bognor Regis

Butlins Playxperience, Bognor Regis

This new activity centre spans two floors, encompassing nearly 50,000 square feet. The immersive indoor hub offers nine state-of-the-art experiences, including Tech Putt, Escape Rooms, VR-cade, Glow Pong, Shuffleboard, Laser Tag, Batting Cages, Neo Games and Digi Darts. Playxperience also includes a café and bar area, as well as changing rooms and restrooms.

Hopkins’ works also included a fully automated ventilation, heating, and cooling system that reacts to variations in building occupancy, the installation of ‘Changing Places’ facilities, integrated standard and decorative lighting systems with full control, a whole-building sound system with independently zoned areas and a fully integrated PA/VA system, and the unification of multiple franchises into one combined, streamlined system.

Pathology Lab – Royal Bournemouth Hospital

Pathology Lab – Royal Bournemouth Hospital

J&B Hopkins is proud to have successfully delivered the Mechanical & Electrical (M&E) services for the state-of-the-art Pathology and Research Facility at Royal Bournemouth Hospital. This innovative two-storey development serves as a vital hub for studying and diagnosing diseases, utilising the latest advancements in medical technology—from routine blood tests to advanced genetic screening.

Our M&E solutions ensured that the facility meets the highest standards for healthcare environments, providing efficient, reliable, and future-proofed building services.

Mechanical systems included HTM-compliant ventilation systems, DX cooling for precise climate control, CL3 lab transit barriers for MEP services, four-pipe multifunctional ASHP heating and cooling, carbon filtration for air quality management, domestic water services and a centralised deionised water system, laboratory gas installations, and cold room facilities.

Electrical systems included general and emergency lighting, small power distribution, electrical supplies to mechanical MCCP panels, VRF systems for energy-efficient climate control, advanced fire alarm and security systems—including CCTV, intruder alarms, and access controls—and integration with the Building Energy Management System (BEMS) for optimised performance.

Enderby Battery Storage

Enderby Battery Storage

Hopkins Energy successfully completed the Enderby Battery Storage Project, installing 16 new CATL BESS units and reconfiguring existing Sungrow units to ensure compatibility with the Sungrow Power Conversion System (PCS).

The project involved retaining Sungrow BESS units in their original positions while disconnecting and replacing outdated DC and communication cabling. Trenching, ducting, and new cabling were installed to connect these units to updated PCS locations. For the new CATL BESS units, the team prepared the ground, installed 16 concrete plinths, laid trackways, and implemented a new earthing system. Auxiliary power and communication cabling were also installed and tested.

Hopkins Energy reviewed and updated the electrical design to ensure compatibility, installing three new LV feeder pillars and updating auxiliary power connections. Comprehensive testing was completed to verify functionality. Throughout the works, 24/7 site security was in place to safeguard equipment and maintain safety.

This project was completed efficiently, ensuring seamless integration of new and existing systems.

Penwortham Battery Storage

Penwortham Battery Storage

Hopkins Energy successfully completed the Penwortham Battery Storage project, involving the installation of new CATL Battery Energy Storage System (BESS) units and relocation of existing Sungrow BESS units. Gresham House oversaw equipment delivery and commissioning.

Key activities included reconfiguring cabling, removing PCS units 1–8, and updating connections from battery containers 2–8 to PCS units 9–15. The CATL BESS installation involved preparing ground, installing concrete plinths, positioning BESS and auxiliary cabinets, stabilising with shingle, and constructing trackways. Cable management covered laying and terminating DC, auxiliary, and communications cabling, along with installing a new earthing system. HV services were reconfigured, and new cabling was installed for PCS and auxiliary connections. Hopkins Energy conducted testing on all new cabling, while Gresham House commissioned BESS systems and communications. Site security measures were implemented to safeguard equipment and ensure safety throughout the project.

This collective effort ensured the project’s smooth and successful completion.